How Often Should a Web Company Update You During a Build?

Twice a week during active build, with each update naming what was finished and linking to something you can open — and a same-day reply to direct questions. Daily updates on a two-week project mostly produce noise; weekly is too slow to catch a problem before it costs you a fortnight.

The moment it happens

How often should a web company update you during a build is a question that arrives with a specific feeling: you don’t want to be the client who messages every day, but you also have no idea what’s happening.

So you wait. Four days pass. Then you send a slightly apologetic “any update?” — and that dynamic, where progress information is something you have to extract, is the actual problem.

A realistic cadence

Project stage Reasonable update frequency
Requirements and structure One summary of what was agreed, in writing
Design An image or file for the home page, then a reply to your feedback within a day
Active build Twice a week, each with a link
Revisions A reply per round within one working day
Pre-launch Daily, briefly — this week has many small moving parts
After launch On request, plus one check-in after two weeks

Adjust for scale. A five-page site doesn’t need a daily standup. A store with payment integration and stock genuinely does need more contact during the build.

What a useful update actually contains

Most updates fail not because they’re infrequent but because they’re empty. “Working on it, sir” is contact without information.

Three elements make one useful:

  1. What was completed — named. “Home and About pages are built with your text.”
  2. A link — the staging address, so you can verify it yourself.
  3. What’s next, and what’s needed from you — this is the part that saves time. If the build is waiting on your product photographs, you want to know today rather than at the end of the week.

A useful update is two lines long. It doesn’t take effort; it takes the habit.

Set it before work starts

One message, sent with your advance:

Before we start — can we agree on updates twice a week, say Tuesday and Friday, with the staging link each time? And I’ll get you feedback within a day of each round.

Three reasons this works. It’s specific, so there’s nothing to interpret. It’s mutual — you’re committing to your side, which is what makes it reasonable rather than demanding. And the response tells you something: a developer who agrees readily is organised; one who deflects an eight-word-a-week commitment is telling you about the next four weeks.

Reading the cadence as a signal

Communication decay is the earliest reliable warning that a project is drifting. It shows up before missed deadlines do.

Watch for the sequence: replies within minutes, then within hours, then only after you’ve followed up twice, then not at all. When you notice you’ve moved from stage one to stage three, act then — while there’s still a project to correct — rather than after the deadline passes.

The reverse is also worth noticing. Consistent, boring, twice-weekly updates with links are the best available predictor of a project that lands.

Your side of it

To be fair about where delay actually accumulates: clients break cadence too, and often more expensively.

  • Feedback in dribbles. Three messages a day for a week is harder to act on than one numbered list.
  • Approval that waits on someone travelling. Nominate a decision-maker who is available.
  • Going quiet during content collection. The most common project stall, and it looks identical from the developer’s side to being ghosted.

If you want a developer to hold a cadence, hold yours. It’s also the fastest way to be treated as the priority client among their five.

What to do this week

  1. Send the cadence message — twice weekly, with a link, both ways.
  2. Ask for the staging link now if you don’t have one.
  3. Note where your replies currently sit: minutes, hours, or days.
  4. Commit to giving feedback as one numbered list per round.
  5. If you’re already at “only replies after two follow-ups”, escalate in writing rather than waiting.

If you want it done the certain way

We update twice a week with a link you can open, and we tell you what we need from you in the same message — because most delay is waiting on content nobody asked for clearly. If you’re currently getting silence, send us the project and we’ll tell you where it actually stands. WhatsApp us; we reply in about five minutes between 9am and 7pm.

Related reading

FAQ

How often should a web developer send project updates?
Twice a week during the active build is a sensible standard for a small business site, with each update naming completed work and linking to a staging site. Direct questions deserve a same-day reply.

Is it unreasonable to ask a developer for daily updates?
On a short project, usually yes — daily reporting on a two-week build produces noise rather than information. A twice-weekly update with a link you can check yourself gives you more genuine visibility.

What does it mean when a developer’s replies slow down?
Communication decay is typically the earliest sign a project is drifting, appearing before deadlines are missed. Escalate in writing when you notice replies only arrive after repeated follow-ups.